To use the recycled water hydrants, contractors must obtain a purple recycled water construction meter from the District. Recycled water hydrants have unique nozzles that do not fit the Districts yellow potable water construction meters. This minimizes the possibility of cross connections between the potable and recycled water distribution systems.
Contractors may apply for a recycled water construction meter at the Permit Counter at the District Office. They will be asked to complete a Construction Meter Use Agreement and a Water Reuse Permit and pay a deposit and any applicable fees.
The District Office is located at 7051 Dublin Blvd. in Dublin.
Where recycled water distribution mains are adjacent to a construction site, DSRSD may allow temporary connection to the distribution main. For more information, call (925) 828-0515 and follow menu prompts to engineering, construction permits.