Skip Navigation
Dublin San Ramon Services District
Search Engine
Connection Fees
 
DSRSD & ZONE 7 WATER CONNECTION FEES
FOR CONTRA COSTA COUNTY (DOUGHERTY VALLEY)
  Dublin San Ramon Services District Connection Fees
Dublin San Ramon Services District (DSRSD) provides potable water and recycled water distribution services to Dougherty Valley. New connections to DSRSD’s water distribution systems represent an increase in demand for water distribution services. DSRSD code requires that this demand be assessed in the form of a water connection fee payable to DSRSD upon final map recordation and issuance of a water line construction permit. In other words, customers purchase capacity in the DSRSD water distribution systems. Fees are based on meter size.
   
 
Meter Size Current Fee
5/8" $ 7,698.00
3/4" 11,547.00
1" 19,244.00
1 1/2" 38,488.00
2" 61,579.00
 


For information on fees for larger meters or other questions, please call (925) 828-0515 and follow menu prompts to Engineering, new construction. NOTE: DSRSD fees are revised annually on July 1 based on changes in the Engineering News Record (ENR) Construction Costs Index and are subject to change at other times. Recycled water connection fees are equivalent to the DSRSD Water Connection Fees.

Zone 7 Connection Fees
Zone 7, Alameda County Flood Control and Water Conservation District (Zone 7) provides potable water treatment services to the Dougherty Valley area of San Ramon. Zone 7 delivers treated potable water to DSRSD’s water distribution system for distribution to consumers. New connections to DSRSD’s potable water distribution system represent an increase in demand for water treatment services. Zone 7’s code requires that this demand be assessed in the form of a water connection fee. DSRSD water connection fees are collected prior to issuance of water line construction permits and Zone 7 water connection fees are collected by DSRSD prior to meter set. Zone 7 water fees are shown below.

 
Meter Size
Zone 7 Water Connection
Fees in Alameda County
5/8" *d
$      22,634.10
 
3/4" *d
33,951.15
 
1"*d
56,585.25
 
1 1/2"*d
113,170.50
 
2"*d
181,072.80
 
1 1/2"*t
271,609.20
 
2"*t
362,145.60
 
3"*t
792,193.50
 
4"*t
2,263,410.00
 
6"*t
4,526,820.00
 
8"*t
7,921,935.00
 
10"*t
12,448,755.00
 
*d = Positive Displacement Meter      *t = W Series Turbo Meter
Water connection fees for meters larger than 1½ inches are determined on a case-by-case basis.
   
 


The above fees include connection fees, facility use fees, and administrative fees. Water connection fees for meters larger than 1 1/2 - inch are determined on a case-by-case basis.

Please note that Zone 7 fees are subject to change. For questions concerning Zone 7 fees, please call Steven Ellis at
(925) 454-5037.

Revised on


Main Content  |  Meetings  |  Billing Information  |  About DSRSD  |  Employment  |  Publications  |  News Releases  |  Links  |  Your Water Service
Construction Projects  |  Kids & Education  |  What We Do/Services Offered  |  Doing Business with DSRSD/Permits & Fees  |  Contact
disclaimer