Standard Procedures, Specifications and Drawings

Print
Press Enter to show all options, press Tab go to next option

Download ENTIRE Standard Procedures and Specs - not including Drawings

Appendix A - Approved Materials List

Appendix B - Standard Details

Appendix C - DHS Separation

Appendix D - Disinfection Plan

Drawings (Download by Category

General Details

Sewer Details

Water Details

Drawings (Download Individually)

G-1 Standard Trench Section for Water and Sewer Mains and Side Sewer Installations
G-2 Concrete Encasement Section
G-3 Close Crossing Detail
G-4 Marker Post (4” x 4”)
G-4A Roman Numeral Chart
G-5 Standard Trench Dam for Water and Sewer Mains and Side Sewer Installations
G-6 Clearance Requirements for Water Mains From Other Utilities and Structures
S-1 Peaking Factor Versus Average Daily Flow
S-2 Standard Manhole
S-3 Drop Manhole
S-4 Standard Shallow Manhole
S-5 Standard Manhole Frame and Cover
S-6 Miscellaneous Manhole Details
S-6A Manhole Pad Details
S-7 Manhole Frame and Cover Adjustment Details
S-8 Typical Side Sewer Installation
S-8A Typical Overflow Relief Valve Installation
S-9 Lateral Sewer Connection to Existing Sewer Main
S-10 Side Sewer Cleanout Riser for Commercial, Industrial and Multi-Family Complexes
S-11 Sampling Manhole
S-12 Grease and Sand Trap
S-12A Grease and Sand Trap for Trash Enclosure
S-13 Grease Interceptor 750-1500 Gallon Capacity
S-14 Grease Interceptor 2000-3000 Gallon Capacity
S-15 Sampling Box
S-16 Manhole: False Bottom 
W-1 Valve Box Installation
W-2 Concrete Thrust Blocks
W-3 Concrete Thrust Blocks for Vertical Bends
W-4 Valve Nut Extension
W-5 Backflow Prevention Method for Tanker Trucks and Portable Spray Rigs
W-6 Fire Hydrant Installation
W-7 1” Service Installation
W-8 1 ½” – 2” Service Installation
W-9 2” Blow-off Assembly at Dead End 6” and 8” mains
W-13 Gate Valve Installation 10” Gate Valve and Smaller
W-14 Butterfly Valve Installation 12” to 18” BFV
W-15 1” Air Release & Vacuum Relief Valve Installation 6”-10” Potable Water Mains
W-16 2” Air Release & Vacuum Relief Valve 12” Potable Water Main or Larger Installation
W-17A Excavation for Tapping Sleeves & Valves
W-18 Combination Blowoff and Sampling Tap for 2” to 3” Blowoff (Temporary Installation)
W-19 Meter Box Installations 5/8 Inch to 3 Inch
W-20 3” Meter Installation
W-20A 4-Inch Service w/2-Inch Meter Installation
W-21 Backflow Preventer Installation ¾” to 2”
W-22 2 ½” to 10” Reduced Pressure Backflow Prevention Device
W-23 Double Detector Check for 2 1/2”-10” Fire Lines Above Ground Installation
W-23A Double Detector Check for 2 1/2”-10” Fire Lines Above Ground Installation (Optional)
W-24 Manifold Main for Clustered Services Serving Condominiums
W-24A 1” Water Service with Two 5/8” Meter Manifold
W-24B 2” Water Service with Three 5/8” Meter Manifold
W-24C 2” Water Service with One ¾” Meter & One 1-1/2” Meter Manifold Installations
W-25 Fiberglass Enclosure for Backflow Preventer
W-26 Standard Sampling Station
W-27 Air Release & Vacuum Relief Valve Cover
W-28 Recycled Water Sign Post Detail
W-28A Standard Details for Placement of Recycled Water Irrigation Signs
W-28B Recycled Water Aluminum Sign Detail
W-29 Brass Address Tags for Manifolded Meters Sampling Station
W-30 Construction Jumper
W-31 ¾” to 3” PRV Installation For Recycled Water Irrigation System
W-32 Recycled Water Fire Hydrant Installation

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer