Reservoir 20B Frequently Asked Questions

Example of Existing DSRSD Buried Water Reservoir 10B

DSRSD's newest water reservoir, Reservoir 20B, will support service-area growth and strengthen the resiliency of the water delivery system. Click below to learn more about the project, its benefits, and what nearby residents can expect during construction.

What is a water reservoir?

Water reservoirs are a critical part of DSRSD’s water delivery system. They store treated drinking water so that customers have a steady, reliable supply throughout the day, even during periods of high demand. Reservoirs also help maintain consistent water pressure across neighborhoods, support firefighting needs, and provide essential backup storage during emergencies.

Why was this location selected to build a water reservoir?

DSRSD evaluated several potential locations to build a new water reservoir, using criteria such as elevation, construction feasibility, system reliability, environmental considerations, and community compatibility. The additional storage at this location improves system resilience, supports current and future development, and helps maintain consistent pressure for nearby homes.

Eastern Dublin has experienced significant growth in recent years, resulting in higher water demand. Reservoir 20B will help DSRSD continue to deliver reliable water service as the community expands. The eastern Dublin location is a desirable option due to its constructability, overall cost, and proximity to new homes in the DSRSD service area.

Additionally, by positioning reservoirs at high points throughout DSRSD’s service area the District is able to use gravity pressure to deliver water into homes, which helps keep costs down for DSRSD customers.

How is this project being funded?

Reservoir 20B will be fully funded from the District's capital water expansion fund, which is used to expand or add facilities to serve drinking water to the growing service area. The source of funding for the capital water expansion fund is 100% from fees paid by developers to connect new homes and businesses to the water system.

What are the benefits to building Reservoir 20B?

DSRSD customers will enjoy several benefits from the addition of Reservoir 20B to DSRSD's infrastructure, including:

  • Additional storage to support emergency preparedness and firefighting

  • More consistent water pressure across the service area

  • Greater water reliability to serve current and future households

  • A buried design that minimizes visual impacts on the surrounding neighborhood

What steps is DSRSD taking to avoid impacting local wildlife?

DSRSD places fencing around Reservoir 20B's property to protect California Tiger Salamanders

DSRSD is committed to responsible construction that follows all environmental regulations protecting wildlife. Pre-construction investigation has identified one species of concern in the area: the California tiger salamander (salamander).

To protect salamanders, DSRSD has installed environmental fencing to keep salamanders out of the construction zone. Additionally, the District will have an environmental consultant to monitor the site for salamanders throughout construction. If a salamander is identified onsite, the District will immediately contact the designated biologist to relocate the animal in accordance with requirements outlined by the California Department of Fish and Wildlife.

These steps help support environmentally responsible construction and uphold DSRSD’s commitment to protecting local wildlife.

What steps is DSRSD taking to minimize impacts to the surrounding neighborhood?

During construction, impacts to nearby residents will be minimized. Water service disruptions are expected to be minimal, and construction staging will remain within DSRSD easements rather than public roadways. DSRSD will follow all construction guidelines set forth by the City of Dublin to minimize dust from construction.

Similar to existing buried reservoirs in DSRSD's service area, once constructed Reservoir 20B will be below ground, which will significantly reduce visual impacts. Only a security fence, access features (like stairs), and equipment cabinets will be visible above the surface. A security fence also will be located near the property line to protect the new reservoir. An example of a DSRSD buried water reservoir is shown on this page.

What is the project schedule?

Construction is anticipated to begin later this year, with work continuing until the reservoir is completed and placed into service in 2028. At this time, no second phase or expansion is planned.